Pages that link to "Item:Q4632826"
From MaRDI portal
The following pages link to Operations sequencing for a multi‐stage production inventory system (Q4632826):
Displaying 7 items.
- Sequencing of jobs in some production system (Q1582040) (← links)
- Cost reduction through operations reversal (Q1751776) (← links)
- Surgical scheduling by fuzzy model considering inpatient beds shortage under uncertain surgery durations (Q2159566) (← links)
- Sequential production situations and potentials (Q2735142) (← links)
- The Effect Of Two Classes Of Process Organizations On Multi-Stage Production / Inventory Systems (Q3335505) (← links)
- Sequence for managing the situational factors to improve the performance of production and inventory control system (Q4399130) (← links)
- Operating room scheduling for non-operating room anesthesia with emergency uncertainty (Q6099417) (← links)