Pages that link to "Item:Q4650620"
From MaRDI portal
The following pages link to METAHEURISTICS FOR THE MIXED SHOP SCHEDULING PROBLEM (Q4650620):
Displaying 14 items.
- Optimising a coal rail network under capacity constraints (Q656055) (← links)
- A rollout metaheuristic for job shop scheduling problems (Q702727) (← links)
- Scheduling trains as a blocking parallel-machine job shop scheduling problem (Q1017462) (← links)
- Metaheuristics for the integrated machine allocation and layout problem (Q1042704) (← links)
- An effective heuristic algorithm for the partial shop scheduling problem (Q1652579) (← links)
- A DSS based on optimizer tools and MTS meta-heuristic for the warehousing problem with conflicts (Q1708260) (← links)
- A comparative study on three graph-based constructive algorithms for multi-stage scheduling with blocking (Q2423281) (← links)
- Triage scheduling optimization for mass casualty and disaster response (Q2788521) (← links)
- COMPARISON OF SCHEDULING EFFICIENCY IN TWO/THREE-MACHINE NO-WAIT FLOW SHOP PROBLEM USING SIMULATED ANNEALING AND GENETIC ALGORITHM (Q3379502) (← links)
- APPLYING METAHEURISTICS TO FEEDER BUS NETWORK DESIGN PROBLEM (Q4655007) (← links)
- Metaheuristics for meltshop scheduling in the steel industry (Q5428974) (← links)
- Using metaheuristic compromise programming for the solution of multiple-objective scheduling problems (Q5464237) (← links)
- A real-world mine excavators timetabling methodology in open-pit mining (Q6050355) (← links)
- An adapted constraint-programming formulation of the resource-constrained project scheduling problem applied to the identical parallel machines group shop and mixed shop scheduling problems (Q6659821) (← links)