Pages that link to "Item:Q4651709"
From MaRDI portal
The following pages link to A note on scheduling parallel machines subject to breakdown and repair (Q4651709):
Displaying 11 items.
- Total completion time minimization on multiple machines subject to machine availability and makespan constraints (Q319146) (← links)
- Bicriteria scheduling concerned with makespan and total completion time subject to machine availability constraints (Q631768) (← links)
- Optimal control strategies for single-machine family scheduling with sequence-dependent batch setup and controllable processing times (Q892912) (← links)
- Parallel machine makespan minimization subject to machine availability and total completion time constraints (Q2304115) (← links)
- Maximizing the number of jobs scheduled at their baseline starting times in case of machine failures (Q2305019) (← links)
- Evaluation of the expected makespan of a set of non-resumable jobs on parallel machines with stochastic failures (Q2629648) (← links)
- A Note on Stochastic Scheduling on a Single Machine Subject to Breakdown and Repair (Q3415869) (← links)
- On the Distribution of the Maximum Number of Broken Machines for the Repairman Problem (Q4292626) (← links)
- Scheduling on \(M\) parallel machines subject to random breakdowns to minimize expected mean flow time (Q4306273) (← links)
- (Q4331897) (← links)
- A note on parallel machine replacement (Q5287182) (← links)