Pages that link to "Item:Q4661103"
From MaRDI portal
The following pages link to A two-stage heuristic for disassembly scheduling with assembly product structure (Q4661103):
Displaying 13 items.
- Heuristics for demand-driven disassembly planning (Q850301) (← links)
- Heuristics for solving disassemble-to-order problems with stochastic yields (Q850645) (← links)
- Heuristic solution methods for the selective disassembly sequencing problem under sequence-dependent costs (Q2027018) (← links)
- Stochastic program for disassembly lot-sizing under uncertain component refurbishing lead times (Q2160509) (← links)
- Towards circular economy in production planning: challenges and opportunities (Q2189927) (← links)
- On the cooperation of recycling operations (Q2256148) (← links)
- Capacitated disassembly scheduling with random demand (Q3168921) (← links)
- A Lagrangean heuristic algorithm for disassembly scheduling with capacity constraints (Q3433485) (← links)
- A branch and bound algorithm for disassembly scheduling with assembly product structure (Q3617337) (← links)
- Machine Scheduling for Multi-product Disassembly (Q4596498) (← links)
- Disassembly scheduling: literature review and future research directions (Q5444546) (← links)
- KI 2005: Advances in Artificial Intelligence (Q5897751) (← links)
- Capacitated disassembly lot-sizing problem with disposal decisions for multiple product types with parts commonality (Q6619776) (← links)