Pages that link to "Item:Q4661112"
From MaRDI portal
The following pages link to Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms (Q4661112):
Displaying 47 items.
- Scheduling resource-constrained projects with a flexible project structure (Q319777) (← links)
- Solving resource-constrained project scheduling problems: conceptual validation of FLP formulation and efficient permutation-based ABC computation (Q336432) (← links)
- Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem (Q415556) (← links)
- Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers (Q421579) (← links)
- An effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problem (Q433107) (← links)
- Time and work generalised precedence relationships in project scheduling with pre-emption: an application to the management of service centres (Q439612) (← links)
- Multi-mode resource-constrained project scheduling problem with material ordering under bonus-penalty policies (Q526633) (← links)
- Project scheduling heuristics-based standard PSO for task-resource assignment in heterogeneous grid (Q535971) (← links)
- Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683) (← links)
- A double genetic algorithm for the MRCPSP/max (Q709102) (← links)
- Reactive scheduling in the multi-mode RCPSP (Q709110) (← links)
- Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting (Q859913) (← links)
- Scheduling projects with heterogeneous resources to meet time and quality objectives (Q954926) (← links)
- Solving the discrete time/resource trade-off problem in project scheduling with genetic algorithms (Q990459) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- Differential evolution for solving multi-mode resource-constrained project scheduling problems (Q1010277) (← links)
- A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem (Q1037664) (← links)
- A genetic algorithm for multi-mode resource constrained project scheduling problem (Q1278080) (← links)
- A path-relinking algorithm for the multi-mode resource-constrained project scheduling problem (Q1651597) (← links)
- An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: the single mode case (Q1681264) (← links)
- An efficient particle swarm optimizer with application to man-day project scheduling problems (Q1718586) (← links)
- A multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problem (Q1752254) (← links)
- Parallel hybrid heuristics for the permutation flow shop problem (Q1761767) (← links)
- Solving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristics (Q1776952) (← links)
- Design and analysis of hybrid metaheuristics for the reliability \(p\)-median problem (Q1926910) (← links)
- Mode-based versus activity-based search for a nonredundant resolution of the multimode resource-constrained project scheduling problem (Q1992769) (← links)
- A robust optimization approach for the multi-mode resource-constrained project scheduling problem (Q2030698) (← links)
- Considering project management activities for engineering design groups (Q2226486) (← links)
- An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances (Q2256244) (← links)
- A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem (Q2270291) (← links)
- Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting (Q2432851) (← links)
- A genetic algorithm for the resource constrained multi-project scheduling problem (Q2482793) (← links)
- Project selection, scheduling and resource allocation with time dependent returns (Q2519075) (← links)
- A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling (Q2519076) (← links)
- A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility (Q2572852) (← links)
- Integrated multi-project planning and scheduling -- a multiagent approach (Q2672092) (← links)
- A modified modeling approach and a heuristic procedure for the multi-mode resource constrained project scheduling problem with activity splitting (Q2798120) (← links)
- (Q3072899) (← links)
- (Q4289898) (← links)
- Optimizing the multiple constrained resources product mix problem using genetic algorithms (Q4674402) (← links)
- Solving Multi-Mode Resource-Constrained Multi-Project Scheduling Problem with Combinatorial Auction Mechanisms (Q5143361) (← links)
- A hybrid genetic algorithm and fuzzy set applied to multi-mode resource-constrained project scheduling problem (Q5174108) (← links)
- An innovative four-layer heuristic for scheduling multi-mode projects under multiple resource constrains (Q5244304) (← links)
- A multiobjective hybrid ant colony optimization approach applied to the assignment and scheduling problem (Q5246811) (← links)
- Multi‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristic (Q6088236) (← links)
- An efficient relax-and-solve method for the multi-mode resource constrained project scheduling problem (Q6588464) (← links)
- A new proactive and reactive approach for resource-constrained project scheduling problem under activity and resource disruption: a scenario-based robust optimization approach (Q6588499) (← links)