Pages that link to "Item:Q4661237"
From MaRDI portal
The following pages link to Minimizing maximum tardiness and number of tardy jobs on parallel machines subject to minimum flow-time (Q4661237):
Displaying 10 items.
- Scheduling uniform parallel machines subject to a secondary resource to minimize the number of tardy jobs (Q858442) (← links)
- Minimum weighted number of tardy jobs on an \(m\)-machine flow-shop with a critical machine (Q1037662) (← links)
- Minimizing the number of tardy jobs for \(m\) parallel machines (Q1127174) (← links)
- A note on the maximum number of on-time jobs on parallel identical machines. (Q1422366) (← links)
- A tardiness-augmented approximation scheme for rejection-allowed multiprocessor rescheduling (Q2168763) (← links)
- Parallel machine scheduling with minimum number of tardy jobs: approximation and exponential algorithms (Q2242051) (← links)
- Generating efficient schedules for identical parallel machines involving flow-time and tardy jobs (Q2566704) (← links)
- Fuzzy bi-criteria scheduling on parallel machines involving weighted flow time and maximum tardiness (Q2813467) (← links)
- Impact of worker and shop flexibility on assembly cells (Q5444495) (← links)
- Bicriteria multi-machine scheduling with equal processing times subject to release dates (Q6145328) (← links)