Pages that link to "Item:Q4678204"
From MaRDI portal
The following pages link to Crossdocking—JIT scheduling with time windows (Q4678204):
Displaying 20 items.
- Synchronization in cross-docking networks: a research classification and framework (Q297360) (← links)
- Optimal deployment of eventually-serializable data services (Q545558) (← links)
- Truck scheduling at zero-inventory cross docking terminals (Q733516) (← links)
- A mixed integer programming model for solving real-time truck-to-door assignment and scheduling problem at cross docking warehouse (Q747012) (← links)
- Transshipment service through crossdocks with both soft and hard time windows (Q763197) (← links)
- A multiperiod vehicle lease planning for urban freight consolidation network (Q1666945) (← links)
- A hybrid Lagrangian metaheuristic for the cross-docking flow shop scheduling problem (Q1711458) (← links)
- A robust two-phase heuristic algorithm for the truck scheduling problem in a resource-constrained crossdock (Q1761198) (← links)
- A hybrid genetic algorithm for the multiple crossdocks problem (Q1954652) (← links)
- A genetic algorithm to minimize the makespan in a two-machine cross-docking flow shop problem (Q2223269) (← links)
- Scheduling inbound and outbound trucks at cross docking terminals (Q2267379) (← links)
- Multiple crossdocks with inventory and time windows (Q2565769) (← links)
- Multiple cross-docks scheduling with multiple doors using fuzzy approach and metaheuristic algorithms (Q2683402) (← links)
- Crossdocking— Just in Time scheduling: an alternative solution approach (Q3636714) (← links)
- Scheduling Problems in Cross Docking (Q3637089) (← links)
- Truck routing and scheduling for cross-docking in the supply chain: model and solution method (Q4603944) (← links)
- Vehicle Sequencing at Transshipment Terminals with Handover Relations (Q4995083) (← links)
- A robust approach to multiple vehicle location-routing problems with time windows for optimization of cross-docking under uncertainty (Q5275867) (← links)
- Cross-docking based factory logistics unitisation process: an approximate dynamic programming approach (Q6168593) (← links)
- The parcel hub scheduling problem with limited conveyor capacity and controllable unloading speeds (Q6176180) (← links)