Pages that link to "Item:Q4706334"
From MaRDI portal
The following pages link to Generalized newsboy model to compute the optimal planned lead times in assembly systems (Q4706334):
Displaying 4 items.
- Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times (Q975990) (← links)
- Calculating safety stocks for assembly systems with random component procurement lead times: a branch and bound algorithm (Q1042216) (← links)
- Optimal supply planning in MRP environments for assembly systems with random component procurement times (Q3541192) (← links)
- Inventory control of raw materials under stochastic and seasonal lead times (Q5712039) (← links)