The following pages link to (Q4782744):
Displaying 5 items.
- Minimizing the total weighted completion time of fully parallel jobs with integer parallel units (Q393040) (← links)
- A PTAS for the average weighted completion time problem on unrelated machines. (Q1592754) (← links)
- Scheduling fully parallel jobs (Q2317138) (← links)
- Designing PTASs for MIN-SUM scheduling problems (Q2489956) (← links)
- Scheduling Fully Parallel Jobs with Integer Parallel Units (Q2988818) (← links)