Pages that link to "Item:Q479265"
From MaRDI portal
The following pages link to Exact resolution of the two-stage hybrid flow shop with dedicated machines (Q479265):
Displaying 9 items.
- A note on ``A heuristic method for two-stage hybrid flow shop with dedicated machines'' (Q336500) (← links)
- A two-stage hybrid flow shop with dedicated machines at the first stage (Q336642) (← links)
- A heuristic method for two-stage hybrid flow shop with dedicated machines (Q339604) (← links)
- Survey and extensions of manufacturing models in two-stage flexible flow shops with dedicated machines (Q1651647) (← links)
- On the optimality conditions of the two-machine flow shop problem (Q1754105) (← links)
- A note on the two-stage hybrid flow shop problem with dedicated machines (Q1926618) (← links)
- On the two-stage hybrid flow shop with dedicated machines (Q3194700) (← links)
- On the two-stage assembly flow shop problem (Q6592922) (← links)
- Scheduling a two stage proportionate flexible flow shop with dedicated machines and no buffers (Q6606700) (← links)