Pages that link to "Item:Q480761"
From MaRDI portal
The following pages link to A GRASP heuristic for slab scheduling at continuous casters (Q480761):
Displaying 6 items.
- Models for scheduling charges in continuous casting: application to a Brazilian steel plant (Q276311) (← links)
- Modelling and a segmented dynamic programming-based heuristic approach for the slab stack shuffling problem (Q732906) (← links)
- Scheduling in a continuous galvanizing line (Q947966) (← links)
- Integration of continuous caster and hot strip mill planning for steel production (Q1585914) (← links)
- A genetic algorithm for the steel continuous casting with inter-sequence dependent setups and dedicated machines (Q4634331) (← links)
- Customized GRASP for rehabilitation therapy scheduling with appointment priorities and accounting for therapist satisfaction (Q6617069) (← links)