The following pages link to (Q4941838):
Displaying 5 items.
- Bicriteria scheduling concerned with makespan and total completion time subject to machine availability constraints (Q631768) (← links)
- Scheduling with tool changes to minimize total completion time: Basic results and SPT performance (Q703937) (← links)
- Assessing the effects of machine breakdowns in stochastic scheduling (Q1116880) (← links)
- Scheduling with limited machine availability (Q1969884) (← links)
- Scheduling with unexpected machine breakdowns (Q5936454) (← links)