Pages that link to "Item:Q5059445"
From MaRDI portal
The following pages link to Concurrent open-pit mine production and in-pit crushing–conveying system planning (Q5059445):
Displaying 4 items.
- A two-step approach to incorporate cut-off grade and stockpiling in oil sands mine planning optimization framework (Q2289895) (← links)
- Production planning and scheduling in mining scenarios under IPCC mining systems (Q2289898) (← links)
- Dragline operation modelling and task assignment based on mixed-integer linear programming (Q2315093) (← links)
- Layout optimization of crushing station in open-pit mine based on two-stage fusion particle swarm algorithm (Q6048041) (← links)