Pages that link to "Item:Q5176351"
From MaRDI portal
The following pages link to Lower bounds for a multi-skill project scheduling problem (Q5176351):
Displaying 4 items.
- Minimizing average project team size given multi-skilled workers with heterogeneous skill levels (Q1651635) (← links)
- Piecewise linear model for multiskilled workforce scheduling problems considering learning effect and project quality (Q1793043) (← links)
- (Q3426433) (← links)
- A Branch-and-Bound method for solving Multi-Skill Project Scheduling Problem (Q3598682) (← links)