Pages that link to "Item:Q523563"
From MaRDI portal
The following pages link to Balancing two-sided U-type assembly lines using modified particle swarm optimization algorithm (Q523563):
Displaying 7 items.
- Multi-neighborhood based path relinking for two-sided assembly line balancing problem (Q306088) (← links)
- Simple and U-type assembly line balancing by using an ant colony based algorithm (Q1011897) (← links)
- Bees algorithm for constrained fuzzy multi-objective two-sided assembly line balancing problem (Q1758046) (← links)
- On the complexity of assembly line balancing problems (Q2003432) (← links)
- Assembly line balancing: what happened in the last fifteen years? (Q2140264) (← links)
- A genetic regulatory network based method for multi-objective sequencing problem in mixed-model assembly lines (Q2160641) (← links)
- Constraint programming approach for multi-objective two-sided assembly line balancing problem with multi-operator stations (Q6094367) (← links)