Pages that link to "Item:Q525065"
From MaRDI portal
The following pages link to Comparative analysis of three metaheuristics for short-term open pit block sequencing (Q525065):
Displaying 5 items.
- A diversified tabu search approach for the open-pit mine production scheduling problem with metal uncertainty (Q1926975) (← links)
- Solution procedures for block selection and sequencing in flat-bedded potash underground mines (Q2241902) (← links)
- Multi-objective approaches for the open-pit mining operational planning problem (Q2840780) (← links)
- A real-world mine excavators timetabling methodology in open-pit mining (Q6050355) (← links)
- Optimization of open-pit mine design and production planning with an improved floating cone algorithm (Q6173792) (← links)