Pages that link to "Item:Q526633"
From MaRDI portal
The following pages link to Multi-mode resource-constrained project scheduling problem with material ordering under bonus-penalty policies (Q526633):
Displaying 4 items.
- Integrated scheduling and batch ordering for construction project (Q1991384) (← links)
- An updated survey of variants and extensions of the resource-constrained project scheduling problem (Q2242185) (← links)
- Material allocation in MRP with tardiness penalties (Q2564888) (← links)
- A chance-constrained optimization approach integrating project scheduling and material ordering to manage the uncertain material supply (Q6568413) (← links)