The following pages link to (Q5271453):
Displaying 13 items.
- Rural postman parameterized by the number of components of required edges (Q314816) (← links)
- Efficient metaheuristics for the mixed team orienteering problem with time windows (Q1736755) (← links)
- Multi-vehicle synchronized arc routing problem to restore post-disaster network connectivity (Q1752846) (← links)
- Data-driven optimization and statistical modeling to improve meter reading for utility companies (Q2147136) (← links)
- Some recent contributions to routing and location problems (Q4434488) (← links)
- (Q4871152) (← links)
- Modeling and Solving the Intersection Inspection Rural Postman Problem (Q5085490) (← links)
- (Q5271452) (← links)
- The Rural Postman Problem on mixed graphs with turn penalties (Q5959378) (← links)
- Arc routing problems: A review of the past, present, and future (Q6087068) (← links)
- A two-phase hybrid algorithm for the periodic rural postman problem with irregular services on mixed graphs (Q6106965) (← links)
- An updated annotated bibliography on arc routing problems (Q6496350) (← links)
- Solving the large-scale min-max \(k\)-rural postman problem for snow plowing (Q6496352) (← links)