Pages that link to "Item:Q5274656"
From MaRDI portal
The following pages link to Scheduling Real-Time Mixed-Criticality Jobs (Q5274656):
Displaying 16 items.
- Schedulability analysis of a graph-based task model for mixed-criticality systems (Q255289) (← links)
- An analysis of the non-preemptive mixed-criticality match-up scheduling problem (Q341470) (← links)
- Graph-based models for real-time workload: a survey (Q497995) (← links)
- Priority-based scheduling of mixed-critical jobs (Q779444) (← links)
- FFOB: efficient online mode-switch procrastination in mixed-criticality systems (Q779449) (← links)
- Dynamic budget management and budget reclamation for mixed-criticality systems (Q779455) (← links)
- The triangle scheduling problem (Q1617282) (← links)
- Speed-robust scheduling. Sand, bricks, and rocks (Q2061889) (← links)
- A fault-tolerant time-triggered scheduling algorithm of mixed-criticality systems (Q2132061) (← links)
- Bounding and shaping the demand of generalized mixed-criticality sporadic task systems (Q2251391) (← links)
- Implementing mixed-criticality synchronous reactive programs upon uniprocessor platforms (Q2251408) (← links)
- Fault-tolerant and real-time scheduling for mixed-criticality systems (Q2251417) (← links)
- Scheduling with uncertain processing times in mixed-criticality systems (Q2315625) (← links)
- Speed-robust scheduling: sand, bricks, and rocks (Q2689830) (← links)
- Preemptive uniprocessor scheduling of mixed-criticality sporadic task systems (Q2796402) (← links)
- (Q5140795) (← links)