Pages that link to "Item:Q5293412"
From MaRDI portal
The following pages link to Determining the optimal lot size for the finite production model with an imperfect rework process of defective items (Q5293412):
Displaying 5 items.
- Effects of imperfect products on lot sizing with work in process inventory (Q545981) (← links)
- Lot-sizing for a single-stage single-product production system with rework of perishable production defectives (Q1871762) (← links)
- An optimal production lot-sizing problem for an imperfect process with imperfect maintenance and inspection time length (Q3644979) (← links)
- An economic production lot size model for defective items with stochastic demand, backlogging and rework (Q5414101) (← links)
- Numerical method for determination of reworking or scraping the defective items in a finite production rate model (Q5467003) (← links)