Pages that link to "Item:Q5321994"
From MaRDI portal
The following pages link to A Brownian Approximation of a Production-Inventory System with a Manufacturer That Subcontracts (Q5321994):
Displaying 11 items.
- Scheduling with compressible and stochastic release dates (Q336364) (← links)
- Optimal ordering policies with convertible lead times (Q852955) (← links)
- Typology and literature review on multiple supplier inventory control models (Q2030495) (← links)
- An improved algorithm for a two-stage production scheduling problem with an outsourcing option (Q2034787) (← links)
- Two-stage production scheduling with an outsourcing option (Q2275802) (← links)
- Production scheduling with subcontracting: the subcontractor's pricing game (Q2434307) (← links)
- Optimizing production capacity and safety stocks in general acyclic supply chains (Q2664281) (← links)
- Continuous-Review (<i>R, nQ</i>) Policies for Inventory Systems with Dual Delivery Modes (Q2957459) (← links)
- Minimizing the average tardiness: the case of outsource machines (Q3498921) (← links)
- Optimal Drift Rate Control and Impulse Control for a Stochastic Inventory/Production System (Q4643310) (← links)
- Optimal Control of Brownian Inventory Models with Convex Holding Cost: Average Cost Case (Q5168872) (← links)