Pages that link to "Item:Q5348802"
From MaRDI portal
The following pages link to Bicriteria Scheduling on a Single Batching Machine with Transportation and Deterioration to Minimize Total Completion Time and Production Costs (Q5348802):
Displaying 3 items.
- Serial batching scheduling of deteriorating jobs in a two-stage supply chain to minimize the makespan (Q319276) (← links)
- Two-machine flowshop scheduling problems involving a batching machine with transportation or deterioration consideration (Q840154) (← links)
- Bicriteria scheduling on a single batching machine with job transportation and deterioration considerations (Q4632837) (← links)