Pages that link to "Item:Q5385396"
From MaRDI portal
The following pages link to Level schedules for mixed-model JIT production lines: characteristics of the largest instances that can be solved optimally (Q5385396):
Displaying 6 items.
- Solving symmetric mixed-model multi-level just-in-time scheduling problems (Q968134) (← links)
- A bicriterion objective for levelling the schedule of a mixed-model, \(JIT\) assembly process (Q1341405) (← links)
- Advanced constraint propagation for the combined car sequencing and level scheduling problem (Q1782169) (← links)
- Optimal production sequencing problem to minimise line stoppage time in a mixed-model assembly line (Q3019223) (← links)
- Modelling the load levelling problem in master production scheduling for MRP systems (Q4230072) (← links)
- On bills of materials structure and optimum product-level smoothing of parts usage in JIT assembly systems (Q5168734) (← links)