Pages that link to "Item:Q5385397"
From MaRDI portal
The following pages link to Production smoothing in just-in-time manufacturing systems: a review of the models and solution approaches (Q5385397):
Displaying 11 items.
- Balancing and scheduling of flexible mixed model assembly lines (Q481715) (← links)
- A multi-objective production smoothing model with compressible operating times (Q638895) (← links)
- Level scheduling for batched JIT supply (Q973058) (← links)
- Advanced constraint propagation for the combined car sequencing and level scheduling problem (Q1782169) (← links)
- Earliness--tardiness production planning for just-in-time manufacturing: a unifying approach by goal programming (Q2432869) (← links)
- Just-in-Time Planning and Lot-Sizing (Q2958674) (← links)
- Stochastic models of simple controlled systems just-in-time (Q3120976) (← links)
- An iterated beam search algorithm for the multi-level production smoothing problem with workload smoothing goal (Q3163160) (← links)
- A Study of Production Smoothing in a Job Shop Environment (Q3216417) (← links)
- JIT manufacturing: The evolution to animplementation model founded in current practice (Q4245244) (← links)
- On bills of materials structure and optimum product-level smoothing of parts usage in JIT assembly systems (Q5168734) (← links)