Pages that link to "Item:Q5392023"
From MaRDI portal
The following pages link to The Economic Lot and Supply Scheduling Problem Under a Power-of-Two Policy (Q5392023):
Displaying 6 items.
- An exact algorithm for solving the economic lot and supply scheduling problem using a power-of-two policy (Q337106) (← links)
- The economic lot scheduling problem under extended basic period and power-of-two policy (Q968005) (← links)
- The Economic Lot and Delivery Scheduling Problem: Powers of Two Policies (Q4897086) (← links)
- A Unified Decomposition Matheuristic for Assembly, Production, and Inventory Routing (Q5137442) (← links)
- The multi-product, economic lot-sizing problem in flow shops: The powers-of-two heuristic (Q5945322) (← links)
- The economic lot scheduling problem under power-of-two policy (Q5948793) (← links)