Pages that link to "Item:Q542588"
From MaRDI portal
The following pages link to New heuristics for solving the economic lot scheduling problem with reworks (Q542588):
Displaying 4 items.
- Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing (Q932268) (← links)
- A search heuristic for the sequence-dependent economic lot scheduling problem (Q1848619) (← links)
- A general variable neighborhood search for single-machine total tardiness scheduling problem with step-deteriorating jobs (Q2438422) (← links)
- Two heuristics for the economic lot scheduling problem: An experimental study (Q3783807) (← links)