The following pages link to Scheduling a hot rolling mill (Q5428937):
Displaying 5 items.
- Rolling horizon scheduling in a rolling-mill (Q1357788) (← links)
- The hot strip mill production scheduling problem: A tabu search approach (Q1609896) (← links)
- Development of hybrid evolutionary algorithms for production scheduling of hot strip mill (Q1761983) (← links)
- Integrated problem of soaking pit heating and hot rolling scheduling in steel plants (Q2003439) (← links)
- A mathematical model and two-stage heuristic for hot rolling scheduling in compact strip production (Q2293881) (← links)