Pages that link to "Item:Q5444619"
From MaRDI portal
The following pages link to Scheduling of unrelated parallel manufacturing cells with limited human resources (Q5444619):
Displaying 4 items.
- Personnel scheduling and supplies provisioning in emergency relief operations (Q256662) (← links)
- A performance comparison and evaluation of metaheuristics for a batch scheduling problem in a multi-hybrid cell manufacturing system with skilled workforce assignment (Q1717033) (← links)
- Multi-parallel work centers scheduling optimization with shared or dedicated resources in low-volume low-variety production systems (Q1988965) (← links)
- (Q4547491) (← links)