The following pages link to Estimating completion-time distribution in stochastic activity networks (Q5464246):
Displaying 15 items.
- Evaluating project completion times when activity times are Weibull distributed (Q703928) (← links)
- Stochastic activity networks with truncated exponential activity times (Q815978) (← links)
- On the latest starting times and criticality of activities in a network with imprecise durations (Q988966) (← links)
- Evaluating project completion time in project networks with discrete random activity durations (Q1017440) (← links)
- Structured construction and simulation of nondeterministic stochastic activity networks (Q1027622) (← links)
- A new analytical algorithm and generation of Gaussian quadrature formula for stochastic network (Q1124724) (← links)
- Activity-on-node networks with minimal and maximal time lags and their application to make-to-order production (Q1372767) (← links)
- A new approach to determine the critical path in stochastic activity network (Q1718645) (← links)
- On computing the latest starting times and floats of activities in a network with imprecise durations (Q1770714) (← links)
- On latest starting times and floats in activity networks with ill-known durations (Q1869710) (← links)
- Proposal of a new distribution in PERT methodology (Q2430618) (← links)
- (Q3149926) (← links)
- Estimating critical path and arc probabilities in stochastic activity networks (Q3696849) (← links)
- Estimating Network Characteristics in Stochastic Activity Networks (Q3746754) (← links)
- Distribution of the Activity Time in Network Analysis: A Critical Revisit with a Gamma Alternative (Q4929163) (← links)