Pages that link to "Item:Q5485056"
From MaRDI portal
The following pages link to Modified drum–buffer–rope scheduling mechanism for a non-identical parallel machine flow shop with processing-time variation (Q5485056):
Displaying 3 items.
- The hybrid flow shop scheduling problem (Q2270289) (← links)
- Bi-level multi-objective mathematical model for job-shop scheduling: the application of Theory of Constraints (Q3163158) (← links)
- Formulation and solution of the drum-buffer-rope constraint scheduling problem ( DBRCSP) (Q4230239) (← links)