Pages that link to "Item:Q5706992"
From MaRDI portal
The following pages link to Advances in Neural Networks – ISNN 2005 (Q5706992):
Displaying 5 items.
- Optimisation of makespan of a flow shop problem using multi layer neural network (Q2224416) (← links)
- The hybrid flow shop scheduling problem (Q2270289) (← links)
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective (Q2379653) (← links)
- A new adaptive neural network and heuristics hybrid approach for job-shop scheduling (Q5945329) (← links)
- A hybrid neural network approach to minimize total completion time on a single batch processing machine (Q6092620) (← links)