Pages that link to "Item:Q5861100"
From MaRDI portal
The following pages link to Optimal replenishment time for retailer under partial upstream prepayment and partial downstream overdue payment for quadratic demand (Q5861100):
Displaying 5 items.
- Optimal payment time for a retailer under permitted delay of payment by the wholesaler with dynamic demand and hybrid number cost parameters (Q1929494) (← links)
- Innovative approach of EOQ structure for decaying items with time sensitive demand, cash-discount, shortages and permissible delay in payments (Q2114709) (← links)
- Optimal replenishment and credit policy in an inventory model for deteriorating items under two-levels of trade credit policy when demand depends on both time and credit period involving default risk (Q4634315) (← links)
- Production and payment policies for an imperfect manufacturing system with discount cash flows analysis in fuzzy random environments (Q5069339) (← links)
- Inventory models for non-instantaneous deteriorating items with expiration dates under the joined effect of preservation technology and linearly time-dependent holding cost when order-size linked to advance payment (Q6573362) (← links)