Pages that link to "Item:Q5888074"
From MaRDI portal
The following pages link to Balancing Just-In-Time Production Units: The<i>N</i>U-Line Balancing Problem (Q5888074):
Displaying 9 items.
- Balancing \(U\)-lines in a multiple \(U\)-line facility (Q1296689) (← links)
- Multi-objective parallel adjacent U-shaped assembly line balancing collaborated by robots and normal and disabled workers (Q2147047) (← links)
- A classification of assembly line balancing problems (Q2371356) (← links)
- A versatile algorithm for assembly line balancing (Q2383104) (← links)
- A survey on problems and methods in generalized assembly line balancing (Q2569060) (← links)
- An optimal piecewise-linear program for the U-line balancing problem with stochastic task times (Q2569065) (← links)
- A survey of the parallel assembly lines balancing problem (Q2664411) (← links)
- ULINO: Optimally balancing U-shaped JIT assembly lines (Q4245448) (← links)
- Heuristic and metaheuristic procedures for the buffer sizing problem in parallel assembly lines balancing problem with multi-line workstations and different cycle times (Q6106588) (← links)