The following pages link to Corrigendum (Q5890879):
Displaying 8 items.
- Erratum to: ``Linear programming models for a stochastic dynamic capacitated lot sizing problem'' (Q1652569) (← links)
- Publisher correction: ``Approaches for periodic inventory control under random production yield and fixed setup cost'' (Q1656430) (← links)
- Correction to: ``Precautionary replenishment in financially-constrained inventory systems subject to credit rollover risk and supply disruption'' (Q1730537) (← links)
- Letter to the editor (with reply) by Moueen Salameh: Optimal lot sizing with regular maintenance interruptions (Q1776734) (← links)
- A note on ``Tactical berth allocation under uncertainty'' (Q2424790) (← links)
- Inflation and the optimal inventory replenishment schedule within a finite planning horizon (Q2514769) (← links)
- Errata to “Inventory Cost Rate Functions with Nonlinear Shortage Costs” (Q3392147) (← links)
- Technical Note—Error Noted in “Order-Based Cost Optimization in Assemble-to-Order Systems” by Lu and Song (2005) (Q4971584) (← links)