Pages that link to "Item:Q5935380"
From MaRDI portal
The following pages link to Starting-time decisions in labor tour scheduling: An experimental analysis and case study (Q5935380):
Displaying 4 items.
- Scheduling workforce relief breaks in advance versus in real-time (Q872250) (← links)
- Mixed-integer programming models for an employee scheduling problem with multiple shifts and work locations (Q2468736) (← links)
- Optimal Models for Meal-Break and Start-Time Flexibility in Continuous Tour Scheduling (Q3114668) (← links)
- Solution approaches to large shift scheduling problems (Q3539809) (← links)