Pages that link to "Item:Q5946721"
From MaRDI portal
The following pages link to A note on the complexity of family scheduling to minimize the number of late jobs (Q5946721):
Displaying 7 items.
- The single machine batching problem with identical family setup times to minimize maximum lateness is strongly NP-hard (Q856324) (← links)
- Customer order scheduling on a single machine with family setup times: complexity and algorithms (Q870129) (← links)
- The complexity of scheduling job families about a common due date (Q1376265) (← links)
- Strong NP-hardness of the single machine multi-operation jobs total completion time scheduling problem. (Q1853011) (← links)
- A survey of scheduling problems with setup times or costs (Q2467249) (← links)
- Pareto optimization scheduling of family jobs on a p-batch machine to minimize makespan and maximum lateness (Q2514124) (← links)
- A hybrid heuristic approach to minimize number of tardy jobs in group technology systems (Q6066616) (← links)