Pages that link to "Item:Q5948205"
From MaRDI portal
The following pages link to Multiple-project scheduling with controllable project duration and hard resource constraint: Some solvable cases (Q5948205):
Displaying 19 items.
- Personnel scheduling and supplies provisioning in emergency relief operations (Q256662) (← links)
- A bicriteria approach to minimize maximal lateness and resource consumption for scheduling a single machine (Q954246) (← links)
- Just-in-time scheduling with controllable processing times on parallel machines (Q975765) (← links)
- A tabu-search algorithm for scheduling jobs with controllable processing times on a single machine to meet due-dates (Q976008) (← links)
- Optimal due date assignment and resource allocation in a group technology scheduling environment (Q991385) (← links)
- Controllable processing times in project and production management: analysing the trade-off between processing times and the amount of resources (Q1666672) (← links)
- An applicable method for modifying over-allocated multi-mode resource constraint schedules in the presence of preemptive resources (Q1698276) (← links)
- The resource dependent assignment problem with a convex agent cost function (Q1753596) (← links)
- The construction of stable project baseline schedules (Q1877894) (← links)
- Scheduling a batching machine with convex resource consumption functions (Q1944176) (← links)
- Revenue sharing for resource transfer among projects (Q2027026) (← links)
- Inverse interval scheduling via reduction on a single machine (Q2158006) (← links)
- Single-machine scheduling with machine unavailability periods and resource dependent processing times (Q2242291) (← links)
- A survey of scheduling with controllable processing times (Q2381529) (← links)
- A branch and bound algorithm for scheduling jobs with controllable processing times on a single machine to meet due dates (Q2430605) (← links)
- Bi-criteria and tri-criteria analysis to minimize maximum lateness makespan and resource consumption for scheduling a single machine (Q2434305) (← links)
- Bicriteria robotic cell scheduling with controllable processing times (Q2997880) (← links)
- Resource-constrained multi-project scheduling problem: a survey (Q6112820) (← links)
- A resource allocation problem with convex resource-dependent processing times under a two-machine flow shop environment (Q6635995) (← links)