Pages that link to "Item:Q5950279"
From MaRDI portal
The following pages link to An agent-based approach for scheduling multiple machines (Q5950279):
Displaying 12 items.
- Scheduling rules to minimize total tardiness in a parallel machine problem with setup and calendar constraints (Q1762106) (← links)
- An algorithm for multi-agent scheduling to minimize the makespan on \(m\) parallel machines (Q2317128) (← links)
- Single-machine multi-agent scheduling problems with a global objective function (Q2434286) (← links)
- A survey of scheduling problems with setup times or costs (Q2467249) (← links)
- (Q2951304) (← links)
- Bio-inspired scheduling for dynamic job shops with flexible routing and sequence-dependent setups (Q3430252) (← links)
- A hybrid control architecture and coordination mechanism in virtual manufacturing enterprise (Q3498922) (← links)
- Two Heterarchical Multiagent Approaches for FMS Dynamic Scheduling (Q4466844) (← links)
- (Q4475482) (← links)
- (Q4736013) (← links)
- (Q4736474) (← links)
- Supply Chain Planning Models in the Pulp and Paper Industry (Q6160205) (← links)