Pages that link to "Item:Q6048133"
From MaRDI portal
The following pages link to Distributed assembly permutation flow-shop scheduling problem with sequence-dependent set-up times using a novel biogeography-based optimization algorithm (Q6048133):
Displaying 4 items.
- A modified biogeography-based optimization for the flexible job shop scheduling problem (Q1664896) (← links)
- Enhanced migrating birds optimization algorithm for the permutation flow shop problem with sequence dependent setup times (Q1694317) (← links)
- An evolution strategy approach for the distributed permutation flowshop scheduling problem with sequence-dependent setup times (Q2146995) (← links)
- Meta-Lamarckian-based iterated greedy for optimizing distributed two-stage assembly flowshops with mixed setups (Q6099438) (← links)