Pages that link to "Item:Q6066283"
From MaRDI portal
The following pages link to Integrated time–cost tradeoff and resources leveling problems with allowed activity splitting (Q6066283):
Displaying 3 items.
- A robust time-cost-quality-energy-environment trade-off with resource-constrained in project management: a case study for a bridge construction project (Q2076443) (← links)
- An updated survey of variants and extensions of the resource-constrained project scheduling problem (Q2242185) (← links)
- The contractor time–cost–credit trade‐off problem: integer programming model, heuristic solution, and business insights (Q6090500) (← links)