Pages that link to "Item:Q6066726"
From MaRDI portal
The following pages link to An MO‐GVNS algorithm for solving a multiobjective hybrid flow shop scheduling problem (Q6066726):
Displaying 4 items.
- A hybrid TP+PLS algorithm for bi-objective flow-shop scheduling problems (Q632658) (← links)
- A hybrid modified-NSGA-II VNS algorithm for the multi-objective critical disruption path problem (Q6068690) (← links)
- Scheduling with day shifts and breaks (Q6070109) (← links)
- Short‐term scheduling with machine calibration (Q6082198) (← links)