Pages that link to "Item:Q6099408"
From MaRDI portal
The following pages link to Resource leveling in projects with flexible structures (Q6099408):
Displaying 8 items.
- Resource levelling in project scheduling with generalized precedence relationships and variable execution intensities (Q280170) (← links)
- A genetic algorithm for the robust resource leveling problem (Q283265) (← links)
- Improving project cost estimation by taking into account managerial flexibility (Q1590029) (← links)
- A cost optimization model for multiresource leveling problem without project duration constraint (Q1727483) (← links)
- Optimal project duration for resource leveling (Q1754113) (← links)
- Resource levelling for projects with schedule-dependent time windows (Q1806946) (← links)
- Software project scheduling under activity duration uncertainty (Q6588492) (← links)
- Metric estimation approach for managing uncertainty in resource leveling problem (Q6588500) (← links)