Pages that link to "Item:Q6099415"
From MaRDI portal
The following pages link to Benders' decomposition based exact solution method for multi-manned assembly line balancing problem with walking workers (Q6099415):
Displaying 6 items.
- Dynamics of 2-worker bucket brigade assembly line with blocking and instantaneous walk-back (Q833563) (← links)
- Combinatorial Benders cuts for assembly line balancing problems with setups (Q1751843) (← links)
- A Benders' decomposition algorithm with combinatorial cuts for the multi-manned assembly line balancing problem (Q1999621) (← links)
- Benders' decomposition for the balancing of assembly lines with stochastic demand (Q2030547) (← links)
- Sequence-dependent time- and cost-oriented assembly line balancing problems: a combinatorial Benders’ decomposition approach (Q6048109) (← links)
- An exact constraint programming based procedure for the multi-manned assembly line balancing problem (Q6551052) (← links)