Pages that link to "Item:Q6106485"
From MaRDI portal
The following pages link to A prediction model for ranking branch-and-bound procedures for the resource-constrained project scheduling problem (Q6106485):
Displaying 3 items.
- Reducing the feasible solution space of resource-constrained project instances (Q6561212) (← links)
- A chance-constrained optimization approach integrating project scheduling and material ordering to manage the uncertain material supply (Q6568413) (← links)
- An adapted constraint-programming formulation of the resource-constrained project scheduling problem applied to the identical parallel machines group shop and mixed shop scheduling problems (Q6659821) (← links)