Pages that link to "Item:Q6112409"
From MaRDI portal
The following pages link to Multi-project scheduling: a benchmark analysis of metaheuristic algorithms on various optimisation criteria and due dates (Q6112409):
Displaying 6 items.
- An evaluation of due date, resource allocation, project release, and activity scheduling rules in a multiproject environment (Q1280129) (← links)
- A two‐layer approach for solving robust decentralized multiproject scheduling problem with multi‐skilled staff (Q6146634) (← links)
- A genetic algorithm with resource buffers for the resource-constrained multi-project scheduling problem (Q6554595) (← links)
- Solving a real-life multi-skill resource-constrained multi-project scheduling problem (Q6588468) (← links)
- The performance of priority rules for the dynamic stochastic resource-constrained multi-project scheduling problem: an experimental investigation (Q6588496) (← links)
- An adapted constraint-programming formulation of the resource-constrained project scheduling problem applied to the identical parallel machines group shop and mixed shop scheduling problems (Q6659821) (← links)