Pages that link to "Item:Q6112694"
From MaRDI portal
The following pages link to Job scheduling under time-of-use energy tariffs for sustainable manufacturing: a survey (Q6112694):
Displaying 4 items.
- Energy-efficient scheduling in manufacturing companies: a review and research framework (Q320771) (← links)
- Single machine parallel-batch scheduling under time-of-use electricity prices: new formulations and optimisation approaches (Q6090154) (← links)
- Exact and heuristic solution approaches for energy-efficient identical parallel machine scheduling with time-of-use costs (Q6096614) (← links)
- Optimizing job shop scheduling with speed-adjustable machines and peak power constraints: a mathematical model and heuristic solutions (Q6609707) (← links)