Pages that link to "Item:Q6135666"
From MaRDI portal
The following pages link to Joint energy capacity and production planning optimization in flow-shop systems (Q6135666):
Displaying 2 items.
- Energy-aware production scheduling in the flow shop environment under sequence-dependent setup times, group scheduling and renewable energy constraints (Q6109801) (← links)
- Berth and quay crane allocation and scheduling problem with renewable energy uncertainty: a robust exact decomposition (Q6164635) (← links)