Pages that link to "Item:Q613775"
From MaRDI portal
The following pages link to Metaheuristics for the multi-objective FJSP with sequence-dependent set-up times, auxiliary resources and machine down time (Q613775):
Displaying 7 items.
- Using the gravitational emulation local search algorithm to solve the multi-objective flexible dynamic job shop scheduling problem in small and medium enterprises (Q492824) (← links)
- Two-agent-based single-machine scheduling with switchover time to minimize total weighted completion time and makespan objectives (Q1730482) (← links)
- Carbon pricing initiatives-based bi-level pollution routing problem (Q2184108) (← links)
- A priority-based genetic algorithm for a flexible job shop scheduling problem (Q2358304) (← links)
- A research survey: review of flexible job shop scheduling techniques (Q2811943) (← links)
- A Taxonomy for the Flexible Job Shop Scheduling Problem (Q5270504) (← links)
- A job scheduling and rejection problem considering self-contained and cross-functional jobs (Q6658908) (← links)