Pages that link to "Item:Q6484298"
From MaRDI portal
The following pages link to Single-machine scheduling with fixed periodic preventive maintenance to minimise the total weighted completion times (Q6484298):
Displaying 8 items.
- Minimizing the weighted sum of maximum earliness and maximum tardiness costs on a single machine with periodic preventive maintenance (Q337029) (← links)
- Minimizing total completion time on a single machine with a flexible maintenance activity (Q613512) (← links)
- Scheduling a maintenance activity to minimize total weighted completion-time (Q1029850) (← links)
- The benefit of preemption for single machine scheduling so as to minimize total weighted completion time (Q1709959) (← links)
- Heuristics for the single machine weighted sum of completion times scheduling problem with periodic maintenance (Q2301137) (← links)
- Scheduling the maintenance on a single machine (Q3154418) (← links)
- (Q5115408) (← links)
- A variable neighborhood search algorithm for solving the single machine scheduling problem with periodic maintenance (Q5380981) (← links)