Pages that link to "Item:Q724000"
From MaRDI portal
The following pages link to Efficient priority rules for the stochastic resource-constrained project scheduling problem (Q724000):
Displaying 17 items.
- Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming (Q319710) (← links)
- Resource allocation in stochastic, finite-capacity, multi-project systems through the cross entropy methodology (Q835552) (← links)
- Bidirectional planning: Improving priority rule-based heuristics for scheduling resource-constrained projects (Q1841162) (← links)
- An approximate dynamic programming approach to project scheduling with uncertain resource availabilities (Q2247268) (← links)
- Stochastic project scheduling with hierarchical alternatives (Q2295321) (← links)
- Augmenting priority rule heuristics with justification and rollout to solve the resource-constrained project scheduling problem (Q2482379) (← links)
- Evolutionary algorithms for multi-objective stochastic resource availability cost problem (Q2656542) (← links)
- An evolutionary approach for resource constrained project scheduling with uncertain changes (Q2664456) (← links)
- The Interaction Between Critical Chain Sequencing, Buffer Sizing, and Reactive Actions in a CC/BM Framework (Q5223040) (← links)
- Priority-Rule Methods for Project Scheduling with Work Content Constraints (Q5391849) (← links)
- Project scheduling cost optimization based on resource transfer costs and robustness (Q6065647) (← links)
- A DRL based approach for adaptive scheduling of one-of-a-kind production (Q6106605) (← links)
- Dynamic assignment of a multi-skilled workforce in job shops: an approximate dynamic programming approach (Q6106764) (← links)
- Dynamic priority rules for combining on-demand passenger transportation and transportation of goods (Q6112779) (← links)
- A chance-constrained optimization approach integrating project scheduling and material ordering to manage the uncertain material supply (Q6568413) (← links)
- A robust multi-project scheduling problem under a resource dedication-transfer policy (Q6573375) (← links)
- Risk assessment and optimal scheduling of serial projects (Q6617066) (← links)